Maesteg Line

Maesteg Line
Overview
Type Heavy Rail
System National Rail
Locale Bridgend county borough
Operation
Owner Network Rail
Technical
Number of tracks Single track
Track gauge 4 ft 8 12 in (1,435 mm) standard gauge

Maesteg Line

Legend
Llynvi and Ogmore Railway
Maesteg
Maesteg (Ewenny Road)
Garth
Llangynwyd
Goods line
Goods line to Margam TMD
Tondu
Sarn
Wildmill
South Wales Main Line
Bridgend
Vale of Glamorgan Line
Pencoed
Llanharan
Pontyclun
Cardiff Central
South Wales Main Line

The Maesteg Line is a commuter rail line in South Wales from Bridgend to Maesteg. Services usually operate from Maesteg to Cheltenham Spa via the South Wales Main Line and Gloucester to Newport Line.

Electrification by 2019 was announced in the Department for Transport's High Level Output Specification of 2012.[1]

History

The Llynfi and Ogmore Railway (L&OVR) was formed on 28 June 1866 (itself the amalgamation of earlier lines); a standard gauge line as opposed to the main line. On 1 July 1873 the GWR took over the L&OVR.

The line from Bridgend originally operated beyond Maesteg through Caerau and the Cymmer Tunnel, known locally as the 'Gwdihw', to passenger stations in Cymmer, known as Cymmer General and further to Abergwynfi. The lines also connected colleries in Abergwynfi and Glyncorrwg. Junctions at both Tondu and Cymmer connected with east-west routes across the Llynfi and Afan valleys.

The Maesteg branch was closed to passenger trains in 1970 (though it remained in use for coal traffic until 1988), and the link with the Afan Valley was lost due to the closure of the Cymmer Tunnel.

A long campaign in the late 1980s and early 90s, resulted in the reopening of the line in 1992 as far as Maesteg by British Rail and Mid Glamorgan County Council. The new stations and line were officially opened by Prince Richard, Duke of Gloucester and a plaque was unveiled at Maesteg station.

The railway north of Maesteg continued to exist until 2004, however it was removed as part of the Maesteg Washery reclamation scheme. The track to the north of Llynfi North Junction, including the former Nantyffyllon and Caerau stations, have been part of a major housing developments. Reconnection with Cymmer (Afan Valley) is financially unviable to reinstate;– the tunnel portal is still visible at the Caerau end but it is completely buried at the Cymmer end.

Today the line is operated by Arriva Trains Wales on services from Cheltenham Spa to Maesteg via Cardiff Central and Bridgend, and repeated from Maesteg to Cheltenham Spa.

The line is currently operated by Arriva Trains Wales (ATW) as part of the Valley Lines network. ATW replaced the previous franchise, Wales & Borders in December 2003.

References

Wikimedia Commons has media related to Maesteg Line.
This article is issued from Wikipedia - version of the 5/23/2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.