Jane LRT

Jane LRT
Overview
Type Light rail
System Toronto subway and RT
Status Revived[1]
Locale Toronto, Ontario
Termini Jane Station
Pioneer Village Station
Operation
Operator(s) Toronto Transit Commission
Technical
Line length 16.5 kilometres (10.3 mi)
Track gauge 1,435 mm (4 ft 8 12 in)
Route map

The Jane LRT is a revived[2] and formerly cancelled proposed light rail line in Toronto, Ontario, Canada. It was revived after being cancelled for three years by the 2013 "Feeling Congested?" report by the City of Toronto, as a "Future Transit Project".

It was part of the Transit City proposal announced March 16, 2007, to be operated by the Toronto Transit Commission. It was expected to cost approximately $630 million, with construction to begin in 2013 and opening in 2017. It was planned as the sixth of the seven Transit City lines to be completed in the plan.

The Jane LRT was cancelled by Rob Ford on December 1, 2010 when he announced the cancellation of Transit City.[3][4] While LRT lines on Sheppard East, Finch West, and Eglinton were revived through a new agreement between the City of Toronto and Metrolinx, the Jane LRT was not included at the time.[5]

The Jane LRT is still included in Metrolinx's regional transportation plan The Big Move under the 15-year horizon. In February 2016, City of Toronto planners and the TTC also recommended implementing the Jane LRT within 15 years.[6]

Route layout

According to initial Toronto Transit Commission planning, the Jane LRT line would have run for 16.5 km between Jane Station on Line 2 Bloor–Danforth, and the Pioneer Village Station currently under construction on the Toronto-York Spadina Subway Extension. Ridership was estimated to be 24 million trips in 2021.

Instead of turning of Steeles Avenue towards Pioneer Village Station, The Big Move illustrates the Jane LRT running north into York Region and terminating at Vaughan Metropolitan Centre Station.

Proposed stops/stations

See also

References

  1. http://www.toronto.ca/legdocs/mmis/2013/pg/bgrd/backgroundfile-64550.pdf
  2. http://www.toronto.ca/legdocs/mmis/2013/pg/bgrd/backgroundfile-64550.pdf
  3. Carter, Tristan (25 February 2011). "Jane LRT goes off the rails". Town Crier. Streeter Publications.
  4. D'Cruz, Andrew (1 December 2010). "Mayor Rob Ford: "Transit City is over"". Toronto Life.
  5. Tess Kalinowski (28 November 2012). "TTC, Metrolinx finally sign off on LRTs". Toronto Star. Retrieved 28 November 2012.
  6. Tess Kalinowski (16 February 2016). "Planners want public's input on 'motherlode' of GTA transit". Toronto Star. Retrieved 2016-02-16.


This article is issued from Wikipedia - version of the 7/22/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.