Toquop Energy Project
Toquop Energy Project is a proposed $1.4 billion energy facility located in Lincoln County near Mesquite, Nevada being built by Sithe Global Power. Phase 1 is a 100-megawatt (130,000 hp) photovoltaic plant scheduled for completion in 2012. Phase 2 of the project is a 700-megawatt (940,000 hp) natural gas station scheduled for completion in 2015.[1][2][3][4]
Notes
- ↑ "Toquop Energy Project Class I-B Operating Permit to Construct Application" (PDF). July 2007. Retrieved November 19, 2012.
- ↑ ROBIN BRAVENDER (March 23, 2010). "Nev. Power-Plant Developers Opt for Gas, Solar". New York Times. Retrieved November 17, 2012.
- ↑ Jennifer Robison (June 15, 2010). "Sithe to use solar, natural gas for Mesquite power plant". Las Vegas Review-Journal. Retrieved November 17, 2012.
- ↑ "Nevada Renewable Energy Summary" (PDF). May 10, 2012. Retrieved November 19, 2012.
This article is issued from Wikipedia - version of the 1/9/2014. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.