MSC Leigh
History | |
---|---|
Name: | MSC Leigh |
Owner: | Mediterranean Shipping Company S.A. |
Operator: | Mediterranean Shipping Company S.A. |
Port of registry: | Panama City, Panama |
Ordered: | 2004 |
Builder: | Daewoo Mangalia Heavy Industries, Mangalia, Romania |
Yard number: | 4,053 |
Christened: | 2006 |
Completed: | 2006 |
Status: | in service |
General characteristics | |
Tonnage: | 54,549 DWT |
Length: | 275 m (902 ft) |
Beam: | 32 m (105 ft) |
Draught: | 13.5 m (44 ft) |
Draft: | 12 m (39 ft) |
Depth: | 21.5 m (71 ft) |
Decks: | 8 |
Propulsion: |
|
Speed: | 24-knot (44 km/h; 28 mph) |
The MSC Leigh is a container ship built in 2006 by the Daewoo Mangalia Heavy Industries in Mangalia, Romania and currently operated by Mediterranean Shipping Company S.A.. She is the second ship delivered to the Swiss company in a series of 12 ordered.[1] The 54,549 DWT ship has a container capacity of 4,860 TEU's.
References
- ↑ "Nava "MSC Leigh" a primit botezul în Şantierul Mangalia" (in Romanian). Cuget Liber. 2006-11-29. Retrieved 2009-02-13.
External links
This article is issued from Wikipedia - version of the 10/11/2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.