Line 7, Chengdu Metro
Line 7, Chengdu Metro | |
---|---|
Overview | |
Type | Rapid transit |
System | Chengdu Metro |
Status | under construction |
Locale | Chengdu, China |
Termini | No Terminals, Loop line only. |
Stations | 31 |
Services | 1 |
Operation | |
Planned opening | Late 2017 |
Owner | City of Guangzhou |
Operator(s) | Chengdu Metro Corporation |
Character | Underground only |
Depot(s) | Chuijiadian |
Rolling stock | Chuanshi |
Technical | |
Line length | 38.61 km (23.99 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Electrification | Third rail, 1,500 V DC |
Line 7 is a route of the Chengdu Metro (Chinese: 成都地铁7号线; pinyin: Chéngdū Dìtiě Qī Hào Xiàn) currently under construction. It will loop between North Railway Station, Chengdu University of Technology, Huaishudian, Chengdu East Railway Station, Sichuan Normal University, Chengdu South Railway Station, Taipinyuan, Jinshan Museum, Southwest Jiaotong University, and City North Coach Terminal Center. The total length will be 38.61 km. Line 7's color is light blue. Construction began on 14 September 2015, and will end in late 2019.[1] It will be an inner circle line.
Inner Loop Line stations
English |
Hanzi |
|
|
— ↑ Loop line towards Beizhan West No.2 Road (City North Coach Terminal Center) ↑ — | |||
North Railway Station | 火车北站 | Chengdu | Jinniu |
Simaqiao | 驷马桥 | Jinniu Chenghua | |
Fuqing Road | 府青路 | Line 15 (Planned) |
Chenghua |
Balizhuang | 八里庄 | ||
Erxianqiao | 二仙桥 | ||
Chengdu University of Technology | 成都理工大学 | Line 8 (No construction) | |
Chuijiadian | 崔家店 | ||
Shuangdian Road | 双店路 | ||
Huaishudian | 槐树店 | (Under construction) | |
Yinghui Road | 迎晖路 | ||
Chengdu East Railway Station | 成都东站 | (Operating) Line 14 Line 20 (Both planned) Chengdu East | |
Daguan | 大观 | ||
Shizishan (Lion Hill) | 狮子山 | Jinjiang | |
Sichuan Normal University | 四川师范大学 | Line 13 (Planned) | |
Liulichang | 琉璃场 | (Under construction) | |
Sanwayao | 三瓦窑 | Line 11 (Planned) |
Gaoxin |
Chengdu South Railway Station | 火车南站 | (Operation) (Under construction) Tram Rong Line 1 Chengdu South | |
Shenxianshu | 神仙树 | (Under construction) | |
Gaopeng Avenue | 高朋大道 | Line 8 (No construction) | |
Taipinyuan | 太平园 | (Under construction) | Wuhou |
Wuhou Avenue(Wuhou Shuangnan) | 武侯大道(武侯双楠) | ||
Longzhuayan (Qingshui River Bridge) | 龙爪堰(清水河大桥) | Line 17 (Planned) | |
Dongpo Road (Guanghuacun) | 东坡路(光华村) | Line 16 (Planned) |
Qingyang |
Cultural Palace (Qingjiang Road) | 文化宫(清江路口) | ||
Jinsha Museum (Jinsha Ruins) | 金沙博物馆(金沙遗址) | ||
Yipintianxia | 一品天下 | Jinniu | |
Chadianzi | 茶店子 | ||
Huazhaobi | 花照壁 | ||
Southwest Jiaotong University | 西南交通大学 | (Under construction) | |
Jiulidi | 九里堤 | ||
Beizhan West No.2 Road (City North Coach Terminal Center) | 北站西二路(城北客运中心) | (Under construction) | |
— ↓ Loop line towards North Railway Station ↓ — | |||
See also
- Urban rail transit in China
- Circler Line
References
- ↑ "地铁7号线首次披露全线站点" (in Chinese). Netease News. 28 November 2012. Retrieved 2013-01-04.
This article is issued from Wikipedia - version of the 10/18/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.