The Leimbach Park (German: Leimbachpark or Park am Leimbach) is a linear park and 100-year flood prevention scheme opened in October 2016 in Wiesloch, Germany.[1] It is part of a larger ecological enhancement of the River Leimbach.[2][3][4][5] The park follows the River Leimbach downstream from Wiesloch to a larger 1.4-hectare (3.5-acre) area just north of Wiesloch-Walldorf station, part of the former Tonwaren-Industrie Wiesloch brickworks.[6][7]

The narrow-gauge railway track of the Wiesloch Feldbahn and Industrial Museum reaches the Landratsamt district government office on the north edge of the park.[8]

Planning

The park is section 2 of a larger three-section construction package on the upper Leimbach. In 2010, along with urban development in South-Walldorf, the park design won a "Landscape in Motion" award in a competition run by Rhine-Neckar Regional Association (Verband Region Rhein-Neckar) under their "Rhine-Neckar Regional Park" concept.[9] It was recognised again in the 2012 Landscape in Motion awards, in connection to the Leimbach Route.[10]

The former railway lift bridge forms the north edge of the park and the border between section 1 and section 2, while the "In den Weinäckern" road bridge forms the south edge of the park and the border between section 2 and section 3.[11] These three sections are themselves part of Measure 3 of the flood control works along the upper Leimbach.[11] The tendered construction works for the parks included 12,000 cubic metres of earth-moving, placement of 200 tonnes of stone/gravel, 2,000 square-metres of road construction, 90 cubic metres of reinforced concrete, and creation of a simple Aluminium cycle path and footbridge to replace the two larger bridges being removed.[12][13]

In 2006 two plots of land at the north corner of the future park were made available for sale by the City of Wiesloch: the former TIW Director's House (Direktorenvilla) at Adelsförsterpfad 12 dating from 1928, and the former TIW main administrative building (Verwaltungsgebäude) at Adelsförsterpfad 14 dating from 1899.[14][15] The former administration building had been the site of a joint-fire drill by the firefighters of Wiesloch and Walldorf in June 2002,[16] but later genuinely caught fire on 22 August 2015.[17][18][19] In March 2012 two further plots of land covering 143,000 square metres (14.3 ha) to the east of the park area were made available. The land was brownfield without buildings and the parcels were for put up for sale by the City of Wiesloch under its MetropolPark Wiesloch-Walldorf brand, designated for future for commercial use in minimum of 1,500-square-metre (0.15 ha) parcels.[20]

On 23 June 2013 two local urban golf teams from Walldorf and Wiesloch offered introductory taster courses in the sport as a way to explore the area designated for the future Leimbach Park.[21][22][23]

Plans and details of the 70%–15%–15% budget split between Baden-Württemberg, Wiesloch and Walldorf, were presented at a meeting in Wiesloch on 29 March 2011.[24] There was an open meeting of the Walldorf city council about the flood protection works on 20 January 2015.[25] The plans were presented to the public in Wiesloch at a meeting on 23 March 2015.[26][27] The meeting was chaired by Peter Henigin.[28][29] It was planned that in late-2016 the area around the park would be sown with wildflower seeds to form a meadow, following a positive experiment on Baiertaler Straße.[30]

Construction

On 10 March 2016, an official groundbreaking ceremony for the €1.5-million project took place with politicians Nicolette Kressl (de), Karl Klein (de), Dirk Elkemann (de), Kai Schmidt-Eisenlohr (de), Christiane Staab, and Mark Töllner of the construction company undertaking the work.[31] Wiesloch and Walldorf were scheduled to contribute €215,000 each for the overall flood protection works, but with only Wiesloch funding the creation of the park itself.[32] The completed design was intended to include seating and a playground.[33]

On 5 April 2016 the 200 metres of the stream bed of the River Leimbach was diverted into a new channel 5 metres north-west of the old channel.[34] Members of the local Kraichgau angling club performed a fish rescue, transferring fish and crabs to the new channel.[34]

During construction the contractors had been using a temporary crossing of the river using buried pipes. On the morning of 17 April 2016 the temporary crossing became covered by flood waters. The Wiesloch fire brigade were called and contractors were called out to create a relief channel.[35][36]

Bridges

Two bridges were removed, the "Lifting Bridge" and the "Isopor-Bridge", with the intention for one replacement bridge. The previous vertical-lift bridge (Hubbrücke) for the mainline railway connection from Wiesloch-Walldorf station to the industrial area had been previously raised permanently above the high water level—later the lifting bridge span was removed from the site completely.[37] On 7 March 2016 the footpath between the railway station and the Landratsamt district office was closed to allow demolition of the second bridge to allow widening of the river channel, and afterwards this would be replaced by a new foot and cycle bridge over the River Leimbach.[38] The second bridge had been constructed by the company "Isopor" which had also committed to take on the costs of any changes required later for the bridge if works on the river were required. After the Cities of Wiesloch and Walldorf purchased the land and bridge, they were deemed to be successors and liable for the costs for demolition and replacement.[39]

The foot and cycling bridge on the new alignment was scheduled to cost €40,000, later lowered in price to €39,000.[32][39]

Further reading

References

  1. "Neue Attraktion: Park am Leimbach" [New Attraction: Leimbach Park] (PDF). Walldorfer Rundschau (43). 29 October 2016. p. 5. Retrieved 27 October 2016. Regierungspräsidentin Nicolette Kressl zur Eröffnung des Parks am Leimbach im Gebiet Weinäcker in Wiesloch, die am 22. Oktober gefeiert wurde. … Mit Musik, einer Runde auf der Feldbahn und Aktivitäten der Firmen im Gebiet Weinäcker verlief die Einweihung trotz starken Regens abwechslungsreich und mit vielen Informationen.
  2. "Der Leimbach in Wiesloch wird ökologisch aufgewertet". Rhein-Neckar-Zeitung (in German). 18 December 2015. Retrieved 15 March 2016.
  3. Fischer, Joachim (3 March 2016). "Spatenstich für den Ausbau des Leimbaches "Park am Leimbach" in Wiesloch" (Press release). Regierungspräsidium Karlsruhe. Retrieved 27 March 2016.
  4. "Baubeginn für den Ausbau des Leimbaches "Park am Leimbach" in Wiesloch; Regierungspräsidentin Nicolette Kressl: "Deutlicher Gewinn für Hochwasserschutz, Naturschutz und Naherholung."" (Press release). Regierungspräsidium Karlsruhe. 10 March 2016. Retrieved 28 March 2016.
  5. "Erster Spatenstich für den Leimbachpark mit Regierungspräsidentin Nicolette Kressl". WiWa Lokal. 20 March 2016. Retrieved 27 March 2016.
  6. "Leimbachpark". WiWa Lokal (in German). 11 December 2012. Retrieved 28 March 2016.
  7. "Ein Leimbachpark zum Spartarif" [A Leimbach Park at a Discount Price]. Lokal Matador (in German). 8 April 2011. Retrieved 29 March 2016. in Wiesloch geht es um ehemaliges Industriegelände im Bereich der früheren Tonwarenindustrie, vor allem aber um den Hochwasserschutz.
  8. "Wiesloch: "Frühlingsfahrtag" im Feldbahn- und Industriemuseum". Rhein-Neckar-Zeitung (in German). 30 March 2015. Retrieved 24 March 2016.
  9. Preis: Leimbachpark in Wiesloch und Stadterweiterung Walldorf-Süd: Wiesloch, Walldorf [Award: The Leimbach Park in Wiesloch and the South-Walldorf urban expansion] (PDF). Landschaft in Bewegung: Der Wettbewerb 2010 (Report) (in German). Regionalpark Rhein-Neckar. 4 June 2012. pp. 7,14–15. Retrieved 28 March 2016.
  10. Preis: Interkommunales Projekt „Leimbachroute“ – Eine landschaftsgebundenen Freizeitroute vom Kraichgau zum Rhein [Award: Inter-Community "Leimbach Route" Project: A Leisure Route through the Landscape from Kraichgau to the River Rhine] (PDF). Landschaft in Bewegung: 2. Wettbewerb und Umsetzung der Projekte (Report) (in German). Regionalpark Rhein-Neckar. Gewässerpädagogische Angebote und Routenbespielung, z.B. in Verbindung mit besonderen und „vergessenen“ Orten und Projekten von Partnern (z.B. das 2010 prämierte Grünprojekt „Leimbachpark“).
  11. 1 2 "Maßnahme 3 - Leimbach-Oberlauf" [Measure 3 – Upper Leimbach]. Regierungspräsidium Karlsruhe. Retrieved 28 March 2016.
  12. Wald + Corbe (17 December 2015). "Öffentliche Ausschreibung nach VOB/A: Ausbau des Leimbachs Leimbach-km 23+270 bis 23+530 "Park am Leimbach"" (tender invitation) (in German). Regierungspräsidium Karlsruhe. Retrieved 31 March 2016.
  13. "Ausbau des Leimbachs "Park am Leimbach"" [Development of the Leimbach Park]. Strassenbau Portal (in German). Strassenbau Portal. Archived from the original (Tender for works) on 28 March 2016. Retrieved 28 March 2016. … Lieferung und Montage von Fußgängersteg in Aluminiumbauweise: 1 St
  14. "Zwei Grundstücke mit Gebäuden: auf dem Gelände der ehemaligen Tonwarenindustrie AG in Wiesloch" [Two plots of land with buildings: On the site of the former Tonwarenindustrie Wiesloch AG brickworks in Wiesloch] (PDF) (in German). Stadt Wiesloch. 23 May 2006. Retrieved 29 March 2016.
  15. "Direktorenvilla TIWAG und Verwaltungsgebäude TIWAG: Lageplan Adelsförsterpfad 12–14" [TIW Director's Villa and TIW Administrative Building: Location plan for Adelsförsterpfad 12–14] (PDF) (in German). 22 May 2006. Retrieved 29 March 2016.
  16. "Grundausbildung 2002". Feuerwehr Wiesloch Homepage (in German). 8 June 2002. Retrieved 12 April 2016.
  17. "Wiesloch: Feuer in altem TIW-Gebäude". Rhein-Neckar-Zeitung. 24 August 2015. Retrieved 12 April 2016.
  18. Suberlak, Nicole (23 August 2015). "Feuerwehreinsatz im Adelsförsterpfad: In leerem Gebäude – Flammen schlagen aus". Heidelberg 24. Retrieved 12 April 2016.
  19. "316 Feuerwehr-Einsätze 2015: Das ging den Wieslochern "an die Substanz"". Rhein-Neckar-Zeitung (in German). 14 January 2016. Retrieved 21 May 2016. Ein weiterer großer Einsatz betraf den Brand in der alten Direktorenvilla [sic] der früheren Wieslocher Tonwarenindustrie TIWAG.
  20. "Gewerbegrundstücksexposé: "Gebiet Weinäcker"" [Commercial land specification: "Weinäcker" Area] (PDF) (in German). Stadt Wiesloch. Gebiet Weinäcker - Flurstücksnummer 2954/10, 3105, 3115
  21. "Crossgolfer boten Sportliches: Schnupperkurs im künftigen Leimbachpark" [Urban Golfers offer Sports: Introductory Course in the Future Leimbach Park]. Lokal Matador (in German). 26 June 2013. Retrieved 27 March 2016.
  22. "Querbeet Open - Ein voller Erfolg!" [Querbeet Open tournament - a Complete Success!]. Porngolfer website (in German). 26 June 2013. Retrieved 27 March 2016. Ort des Geschehens war der sich in Planung und Bau befindliche "Leimbachpark" in der Nähe des Bahnhofs.
  23. "Der Blick in Nachbars Garten ist erwünscht" [Viewing the neighbour's garden is desirable]. Lokal Matador (in German). 27 May 2013. Retrieved 29 March 2016. Die Crossgolfer aus Wiesloch und Walldorf bieten zusätzlich noch eine Gratis-Kurs an. Treffpunkt ist die ehemalige Hubbrücke beim Adelsförsterpfad 14.
  24. Bürgerinformation zum Ausbau des Leimbaches und zum Leimbachpark am 29.03.2011 im Gemeindezentrum der Christusgemeinde [Information for Citizens about Development of the Leimbach and Leimbach Park on 29 March 2011 at the Protestant Church Centre] (presentation with plans) (Report) (in German). 29 March 2011. pp. 19–24. Retrieved 29 March 2016. Land Baden-Württemberg (70 %), die Städte Wiesloch (15 %) und Walldorf (15 %). Der Gesamtaufwand wird auf 5 Mio. Euro geschätzt. … trägt zu 100% die Stadt Wiesloch
  25. "Öffentliche Sitzung des Gemeinderats am 20. Januar 2015 - Hochwassserschutz am Leimbach kommt voran" [Open meeting of the city council on 20 January 2015 – Flood water protection].
  26. Hübner, Ralf (18 May 2015). Dokumentation zur gemeinsamen Informationsveranstaltung des Regierungspräsidiums Karlsruhe mit den Städten Wiesloch und Walldorf für die Bürgerinnen und Bürger sowie die interessierte Fachöffentlichkeit zum Ausbau Leimbach-Oberlauf am Landesgewässer in Wiesloch am 23. März 2015 im Staufersaal des Palatin in Wiesloch (report) (Report) (in German). Regierungspräsidium Karlsruhe. pp. 1–18. Retrieved 15 March 2016.
  27. "Wiesloch / Walldorf: Planungsprojekte zum Ausbau Leimbach-Oberlauf werden vorgestellt". ecoGuide. 9 March 2015. Retrieved 28 March 2016.
  28. Hübner, Ralf (5 March 2015). "Ausbau Leimbach-Oberlauf am Landesgewässer in Wiesloch – Leimbach Buergerabend Programm" [Development of the Upper Leimbach and waters in Wiesloch – Leimbach Citizens–evening Programme.] (PDF) (in German). Stadt Wiesloch. Retrieved 28 March 2016.
  29. "Bürgerabend zum Leimbachausbau" [Citizen's evening about the Leimbach development works] (in German). Stadt Wiesloch. 5 March 2015. Retrieved 28 March 2016. Gewässerabschnitte mit einer Länge von 1,4 und 1,5 Kilometern ökologisch aufgewertet werden.
  30. "‚Hingucker' in der Baiertaler Straße". Wiwa Lokal (in German). 1 June 2016. Retrieved 5 June 2016. Im künftigen Leimbachpark im Bereich des Bahnhofes sollen in diesem Herbst größere Flächen mit artenreichen Blumenwiesen eingesät werden.
  31. "Der Leimbach zwischen Wiesloch und Walldorf wird "wieder neu erlebbar"". Rhein-Neckar-Zeitung (in German). 11 March 2016. Retrieved 15 March 2016.
  32. 1 2 "Hochwasserschutz am Leimbach kommt voran". WiWa Lokal (in German). 7 February 2015. Retrieved 28 March 2016. Dies sind für Wiesloch und Walldorf für das aktuelle Projekt jeweils rund 215.000 Euro bei Gesamtkosten von 1,4 Millionen Euro. … Die Teilmaßnahme Leimbachpark geht jedoch ausschließlich zu Lasten Wieslochs. … Nachdem der Steg zunächst wegen … als wichtige Verbindung für Fußgänger und Radler zwischen Bahnhof und Landratsamt mit neuem Querschnitt wiederhergestellt werden. Knapp 40.000 Euro macht der Anteil hierfür pro Stadt aus.
  33. "Spartenstich zur Parkanlage" [Groundbreaking for Parkland]. de:Radio Regenbogen (in German). 10 March 2016. Retrieved 2 April 2016. neue Wege angelegt, Sitzgelegenheiten geschaffen und Spielplätze gebaut.
  34. 1 2 "Wiesloch: Das neue "Leimbachbett" nimmt Gestalt an". Rhein-Neckar-Zeitung (in German). 6 April 2016. Retrieved 8 April 2016.
  35. Raab, Michael (17 April 2016). "Wasserschaden". Feuerwehr Wiesloch (in German). Retrieved 21 April 2016.
  36. "Wasserschaden im Leimbach-Hochwasserschutz-Sanierungsgebiet". WiWa Lokal (in German). 19 April 2016. Retrieved 21 April 2016.
  37. Hesch, M.; Breslauer, I.; Wald + Corbe Beratende Ingenieure (18 June 2012). "Hubbrücke". Ausbau des Leimbaches: Bach-km 23+270 bis 23+530 (PDF) (Report). p. 16. Retrieved 27 March 2016. Da die Brücke nicht mehr automatisch bewegt werden kann, wurde die Hubbrücke vor Jahren dauerhaft angehoben und die Straßenanbindung durch Dammbalkenelemente verschlossen, so dass derzeit keine Wegeverbindung mehr besteht. Die Hubbrücke soll nun auch aufgrund der städtebaulichen Entwicklung im Zuge des Gewässerausbaus vollständig rückgebaut werden. Damit wird die ursprüngliche Verbindung der Gleisanlagen im Industriegebiet mit den Gleisen der Hauptstrecke endgültig beseitigt.
  38. Link, Ralf (28 February 2016). "Fußwegverbindung vom S-Bahn-Halt zum Landratsamt gesperrt". WiWa Lokal (in German). Retrieved 15 March 2016.
  39. 1 2 Maßnahme 3.2 (Leimbachpark), Zweckverbandsgebiet VViesloch-Walldorf Vereinbarungen mit Land/Stadt Walldorf über den Ausbau [Measure 3.2 (Leimbach Park), Updates to Agreements with the State of Baden Württemberg/City of Walldorf on development] (PDF) (Report) (in German). Stadt Wiesloch. 19 December 2015. Retrieved 29 March 2015. „Isopor-Brücke", sowie der Neubau eines Rad- und Fußgängersteges in diesem Bereich vorgesehen. Ursprünglich waren der Abbruch und die Erneuerung der Brücke im Rahmen der Hochwasserschutzmaßnahmen vorgesehen. Im Rahmen der Planfeststellung wurde ein altes Wasserrecht der Firma lsopor gefunden, nach dem sich der damalige Grundstücksbesitzer verpflichtet hatte, sein Brückenbauwerk im Falle von Umbaumaßnahmen am Gewässer auf seine Kosten zu verändern. Das Wasserrecht ist inzwischen zwar abgelaufen, hatte aber zum Zeitpunkt der Planfeststellung am 16.05.2013 noch Bestand. Das Land beruft sich auf diese Regelung und sieht die Städte Wiesloch und Walldorf als Erwerber von Grundstück und Brücke als Rechtsnachfolger der Firma lsopor deshalb in der Pflicht, die Kosten für einen Neubau des Fußgängersteges je zur Hälfte zu übernehmen.