Greenfaulds High School

Greenfaulds High School
Motto Tak Tyme in Tyme
Established 1971
Type Secondary school
Headteacher Mrs Linda Parks
Location Athelstane Drive
Cumbernauld
North Lanarkshire
G67 4AQ
Scotland
Coordinates: 55°56′12″N 4°00′26″W / 55.9367°N 4.00735°W / 55.9367; -4.00735
Students 1450 (max capacity)
Gender Mixed
Ages 11–18
Houses Bruce
Wallace
Ness
Skye
Thistle
Lewis
Lomond
Colours                Blue, White, Red
Website Greenfaulds High website

Greenfaulds High School is a mixed, non-denominational six-year comprehensive secondary school. The original building was opened in 1971,[1] while the new building was first opened to the public on 29 September 2016.[2] Greenfaulds is situated in the west of Cumbernauld and provides a service to the Greenfaulds, Ravenswood, Condorrat, Westfield, Eastfield, Balloch areas and parts of Seafar. The head teacher is Mrs Linda Parks.[3] The current school building has a maximum capacity of 1,450 pupils.[4] Greenfaulds has six associated primary schools, which are Baird Memorial, Condorrat, Eastfield, Ravenswood, Westfield, and Woodlands.[1]

Facilities

Subjects

The school teaches a wide variety of subjects, most of which are taught through first and second year. Some subjects are only taught as National 5 or Higher and above. Subjects include:

Other facilities

The new building is equipped with lifts accessing all three floors for disabled access. There is an assembly hall for year and group assemblies, as well as theater productions. There is a gym hall which can be viewed from all three floors. Several outdoor sporting facilities are planned for the new building.

Activities & Events

The school usually hosts a theater show at both Christmas and Summer. The shows are performed by the students at the school, as well as the teachers for the Christmas show.

Competitions are held yearly for each of the individual house groups. Houses earn points through individual challenges. The school also hosts an award show at the end of each year. Pupils earn awards based on how many nominations they receive by their teachers (S1-S3) or based on their Prelim results (S4-S6). A guest speaker is also invited to speak at the event.

New School Building

The new school building is currently open to the public, and the original building is planned to be demolished, and the new ground will become the new school pitches. The total cost of the project, which includes the new building, and the sport pitches is an estimated £31.2 million.[5] Although the building will not have a theater or a pool, it will be equipped with sports facilities[6] such as a running track, a tennis court and a grass pitch. The pitches are expected to be completed by August 2017, in time for the new school year 2017-2018.

References

External links

This article is issued from Wikipedia - version of the 11/29/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.