Beltline Trail

This article is about the rail trail in Toronto. It is not to be confused with Atlanta BeltLine.
Beltline Trail

Bridge over Yonge Street
Established 1989
Length 9 km (6 mi)
Location Toronto, Ontario, Canada
Trailheads Bowie Ave. - Beograd Gdns.
Allen Rd. - Mt. Pleasant Rd.
Moore Ave. - Bayview Ave.
Trail map
Legend
Barrie line

Bowie/Croham

Caledonia
Montcalm

Roland
Miranda
Fairbank

Dufferin

Hopewell

Salinas

Walter Saunders
Memorial Park

Tommy Douglas

Beograd

Marlee

Allen Expressway
Line 1 Yonge University

Elm Ridge/Aldburn

Old Park

Bathurst

Chaplin

Eglinton

Russel Hill

Larratt/Duncannon

Avenue Road
Forest Hill Road

Oriole Parkway

Oriole Park

Lascelles

Line 1 Yonge University
Davisville Yard

Yonge

Merton

Mount Pleasant
Mount Pleasant Cemetery

Moore

Heath
Mud Creek

Canadian Pacific

Governor's Bridge

Chorley Park

Don Valley Brick Works Park

Don Valley Brick Works

Bayview
To Lower Don Trail

To
Park Drive Reservation Trail
Milkman's Lane

The Beltline Trail is a 9 km cycling and walking rail trail in Toronto, Ontario. It consists of three sections, the York Beltline Trail west of Allen Road, the Kay Gardner Beltline Park from the Allen to Mount Pleasant Road, and the Ravine Beltline Trail south of Mount Pleasant Cemetery through the Moore Park Ravine. Built on the former right-of-way of the Toronto Belt Line Railway, the linear park passes through the neighbourhoods of Rosedale, Moore Park, Forest Hill, Chaplin Estates, and Fairbank.

History

The Toronto Belt Line Railway opened in 1892. It was constructed as a commuter railway line to service and promote new suburban neighbourhoods north of the then city limits. The railway consisted of two separate loops both starting and ending at Union Station. The east loop started at Union Station, running east until turning north along the Don River, passing the Don Valley Brick Works, up through Moore Park Ravine and along the northern edge of Mount Pleasant Cemetery.[1] Crossing over Yonge Street and what is now the Davisville Subway Yard, the loop continued northwest until Spadina Avenue, where it crossed Eglinton Avenue and turned west, eventually meeting up with the Grand Trunk railway tracks, now the GO Barrie line just west of Caledonia Road.[1] From there, the route circled south back to Union Station.

The passenger train service was never profitable and only lasted two years. Parts of the rail line then sat unused. In 1910, the Grand Trunk rebuilt the northern portion of the Yonge St. Loop for freight service. Trains ran along this line until the late 1960s when a small part of the right-of-way was expropriated to build the Spadina Expressway, now the Allen Road. This ended rail service east of Marlee Avenue, just before the Allen.[2]

In 1970, CN tried to sell the right-of-way east of the Allen for housing since the land was quite valuable. This would set the stage for one of the first public battles on biking trails.[3] Most home owners adjacent to the line wished to buy the land to extend their backyards complaining of safety issues, vandals, and lovers.[3] Both Metro Toronto parks officials and York Mayor Phil White saw it as an opportunity to build a bike path. Toronto Mayor William Dennison and his executive committee favoured buying portions of the Belt Line to expand roads and existing parks.[3] Dennison told the Toronto Star that he opposed a continuous path along the Belt Line because "people have demonstrated they just won't use it", as well as echoing fears of the homeowners.[3]

After two years of talk, the land was purchased by the city in 1972 as part of a land swap with CN that included the Metro Toronto Convention Centre on Front Street.[3] One of the supporters of turning the rail bed into a bike path was alderman David Crombie, who was elected as mayor of Toronto soon after.

CN sold the remaining line west of the Allen to the city in 1988 and its conversion to a trail began.[2] The bridge over Yonge Street was deteriorated and was refurbished in 1993.[2] In 1999–2000 the part of the trail from the Allen Road to Mount Pleasant Road was designated the Kay Gardner Beltline Park after a local councillor, Kay Gardner, who was also involved with the negotiations for that segment of the trail.[4]

The trail reuses almost all of the old railway space. The trail goes over the old iron bridge that crosses Dufferin Street, between Castlefield Ave. and Eglinton Ave.,[5] as well as the bridge over Yonge Street and the Davisville Subway Yard south of Davisville Avenue. There is no crossing of the limited-access Allen Road, and trail users must use footpaths parallel to the Allen to reach the nearest road bridge a half-block north or south. Other roads are crossed at grade, with no formal pedestrian crosswalks; the addition of crosswalks was recommended in a 2013 report.[6][7]

The trail heading west ends just west of Caledonia Road at the former Grand Trunk line, now GO Transit's Barrie line.[1] Heading east, after passing through Mount Pleasant Cemetery, the Beltline Trail then continues southwards through the Moore Park Ravine alongside Mud Creek, a small tributary of the Don River. The trail passes the Don Valley Brick Works and terminates shortly after reaching Bayview Avenue, at a crossroads with two other trails, Park Drive Reservation Trail and Milkman's Lane. An alternate switchback trail through Chorley Park is under development and slated to open in 2017.[8] A series of technical biking or hiking trails including Cudmore Creek and Crothers Woods[9] can be linked from here and make it possible to extend the trail through to the Sunnybrook Estates to the north-west or Taylor Creek Park and Scarborough to the east.

References

Wikimedia Commons has media related to Beltline Trail.
  1. 1 2 3 Throwback Thursday: The Belt Line Railway, Spacing Toronto, July 16, 2009
  2. 1 2 3 Toronto Belt Line - 1892, Derek Boles, Toronto Railway Historical Association
  3. 1 2 3 4 5 Historicist: Cycling Through the Seventies, Torontoist, Jan. 5 2013
  4. Minutes of the Council of the City of Toronto, October 26, 1999 and October 27, 1999, item 12.40 ; clause no. 35 of report no. 13 of the Toronto Community Council, September 27, 1999 ; press release May 26, 2000
  5. "The Beltline trail keeps growing: Micallef | Toronto Star". thestar.com. Retrieved 2016-10-27.
  6. The Beltline Trail - Past, Present and Future, Cycle Toronto, Jan. 29, 2013
  7. Beltline Trail Study, City of Toronto, May 13, 2013
  8. "Chorley Park - Urban Forestry Projects - Trees & Ravines | City of Toronto". Retrieved 2016-10-27.
  9. "Don Valley on Trailforks". Trailforks. Retrieved 2016-10-18.

Coordinates: 43°41′46″N 79°23′54″W / 43.695998°N 79.398397°W / 43.695998; -79.398397

External links

"Beltline Trail Map". Google My Maps. Retrieved 24 May 2015. 

This article is issued from Wikipedia - version of the 11/30/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.