Ayrılık Çeşmesi railway station
AYRILIK ÇEŞMESİ | |
---|---|
TCDD commuter rail station | |
Coordinates | 41°00′01″N 29°01′49″E / 41.0003°N 29.0302°ECoordinates: 41°00′01″N 29°01′49″E / 41.0003°N 29.0302°E |
Owned by | Turkish State Railways |
Line(s) | Marmaray |
Platforms | 1 island platform |
Tracks | 2 |
Connections | M4, İETT bus |
Construction | |
Structure type | At-grade |
Disabled access | Yes |
History | |
Opened | 29 October 2013 |
Electrified | 25 kV AC |
Traffic | |
Passengers (2014) | 38,408 Average daily ridership |
Ayrılık Çeşmesi is a railway station along the newly built trans-Bosphorus Marmaray tunnel. The station is located right outside the Asian portal of the tunnel and is the current eastern terminus of the line. The Turkish State Railways (TCDD) operates trains from Ayrılık Çeşmesi to Kazlıçeşme within 6- to 10-minute intervals. Connection to the M4 station of the Istanbul Metro is available.
Ayrılık Çeşmesi saw 14 million boardings in 2014, making it the busiest station on the Marmaray line. The station made up 25.95% of all passenger boardings of 2014.[1]
Previous | Turkish State Railways | Next |
---|---|---|
Toward Kazlıçeşme |
Layout
Track 1 | → ← Marmaray toward Kazlıçeşme |
Track 2 | → ← Marmaray toward Kazlıçeşme |
Equipment
The railway station features following equipment:[2]
- 2 entrance and exit gates,
- 4 escalators,
- 1 elevator,
- 1 ticket office,
- 2 ticket vending machines,
- 1 credit loading machine for electronic tickets,
- 14 turnstiles including 2 for physically handicapped people and
- 10 passenger information screens.
References
- ↑ Marmaray yolcu istatistiği - marmaray.gov.tr
- ↑ "Ayrılık Çeşmesi" (in Turkish). Marmaray. Retrieved 2014-12-27.
This article is issued from Wikipedia - version of the 8/7/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.